Loading...

Wired for Takeoff

January 8, 2025

Day 1
Day 1
Day 1
Day 1
No items found.

Project Description

The wait is over, and we’re officially kicking off one of our biggest projects to date! After a brief weather delay, our techs are now on-site at this brand-new building, ready to get to work. Armed with 30,000 feet of cable (yes, enough to rival Mount Everest’s height), 103 network drops, and a whole lot of determination, we’re diving into a project that’s as challenging as it is exciting.

This isn’t just about wiring a building; it’s about building the backbone of a fully connected, future-ready office. From wall and floor drops to wireless access points, cameras, and doors, every cable, connector, and hours of labor—estimated at nearly 300 hours—is paving the way for a space that’s as functional as it is seamless.

Seeing this project grow from an empty shell to a fully operational hub is going to be incredible, and we can’t wait to share the journey with you. Stay tuned for updates, pictures, and stories as we bring this ambitious vision to life.

Let’s get to work!

Project Categories

Other Related Projects

Location

Washington Church Road, Miamisburg, Ohio 45342

Drop Us a Line
Thank you! Your submission has been received!

Your message will go directly to our ticketing system and you will hear back from someone shortly.

Have a great day!
Oops! Something went wrong while submitting the form.